Oppmerksomhet: Alle norske bestillinger vil bli sendt av Winston VW Veteran AS (Sandnes, Norge),
så fraktkostnader er nå mye lavere og alle lokale avgifter er nå inkludert i prisen. På store karosserideler må det beregnes leveringstid, og høyere Innenlandsfrakt.
Delene som er nevnt her, har en nær sammenheng med den valgte delen og blir ofte bestilt sammen med den valgte delen eller søkt etter.
Tips: Hvis du ikke får et godt søkeresultat når du skriver inn et søkeord, prøv en del som har noe med det å gjøre, hvis det er en relatert fane, er den søkte delen ofte nevnt der.
Skum luffilter element
Height: 50 mm
Diameter: 135 mm
Fits air cleaner: #2148, #2152 and #5121 Artikkelnummer : 2147
Useful information from Paruzzi magazine and from our YouTube channel :
Engine overhaul - video 16 part 2 valves removal In Part 1, we showed the basic techniques for disassembling the valves and valve springs. We did this on a fairly new cylinder head.
When you`re dealing with a used cylinder head, disassembly may be a little less smooth.
Engine overhaul - video 04 removing the distributor drive shaft We want to give extra attention in this video to the position of the distributor drive shaft of the VW Type 1 engines, . If the drive shaft of the distributor is not correctly mounted during the engine overhaul, problems can arise later with the adjustment of the ignition timing. Disassembling the drive shaft is then the only solution.
Engine overhaul - video 09 the fuel pump We will disassemble and reassemble the mechanical fuel pump from a VW Type 1 engine with carburetor in this video. The electric fuel pump is discussed in another video. The fuel pump pushrod and the fuel pump flange get extra attention in this video.
Engine Overhaul - video 01 video series preview In this video, we will give an overview of the most important steps during the engine overhaul of a type 1 air-cooled Volkswagen engine. Each step will be discussed in a separate video. We will show special tools and even homemade tools to help the enthusiast perform their engine overhaul.
Engine overhaul - video 12 the flywheel In this video, we'll explain how to disassemble and assemble the flywheel, and what tools you'll need to do so. To disassemble the flywheel, you will need to unscrew the gland nut. This nut is attached with a torque of 350 Nm, it will require some force to loosen.
Engine Overhaul - video 02 overhauled engines We show in this video all the engines that we overhauled for the video series. An AB 1300, an AS 1600, an AJ 1600 and a D 1200 engine, every step, every detail of the overhaul of these air-cooled Volkswagen engines will be discussed in this series.
air filter preheating It seems to be a natural part of your air-cooled engine, but the air filter plays a crucial role, it's like breathing in a human being. The carburettor is tasked with mixing petrol with air to deliver a flammable mixture. Petrol alone is not a good fuel. That requires oxygen and not just a little bit of it.
Engine adjustment - video 01 valve clearance The valve clearance is the first thing to check when adjusting an engine. If the valve clearance is not adjusted properly, then adjusting for example, the ignition, or the carburetor, will do little good. In this video we will show you how to adjust the valve clearance.
mixture preheating The engine is stopped as a result of poor combustion. This bad combustion is often caused by a, at that moment, wrong composition of the fuel in the cylinders. Because of this bad combustion, the engine does not deliver the desired power and you can feel this in the form of stuttering of the engine.